Nails, anchors and drains
Nail reinforcement on collapsed wall situated down the road. Drilling with angle drive (providing torque transfer at righ angle) due to high-tension power line being situated juste above the works (work carried out with no electric power outage)![]() |
Odex-drilling of 50 ml-subhorizontal drains in embankment![]() |
Reinforcement of two collapsed walls in graveyard – Nailed wall lined with reclaimed stones – Drilling from crane truck ![]() |
Socket pipe for IRS injection and P2 protection of Ø 40 mm Dywidag anchors.![]() |