Look also for
Blasting Works, Public and Specialized Works

Specialized retaining walls, land stabilization

   page 1   page 2   page 3   page 4   page 5   page 6   page 7   page 8   

Nailed walls and berlinese walls

  Drilling for reinforcement at -18 ml, Sète (34).
Nail drilling at 30 ml with odex tubes
EGT 3200 drill with automatic bar loader
and PR 270 drill mounted on excavator
Nail drilling at  30 ml with odex tubes, EGT 3200 drill.
Drilling for reinforcement at -18 ml, Sète (34).
Slightly raised drill trajectory with Ø 200 odex
over 30 ml to reach the bottom of an observation well
in drainage tunnel Ø 1000 and 10 ml depth
– Cliff at Biarritz (64)
Mast of excavator-mountedl
hydraulic dril.
Excavation and installation of downward-inclined concrete
blocks after berlinese wall,
gunite spraying, anchor drilling and levelling out again

Slightly raised drill trajectory with Ø 200 odex at Biarritz (64)Excavation and installation of downward-inclined concrete blocks after berlinese wall, gunite spraying, anchor drilling and levelling out again

 

Copyright © 2024 MTPS english version - Website creation : CAPLASER