Look also for
Blasting Works, Public and Specialized Works

Environmental works

   Page 1     Page 2   Page 3   Page 4   Page 5   Page 6   

Treatment of industrial and mining sites

 

2 Ha-secondary mining patch, 4 condemned shafts and 5 wells, 180 to 483 ml, filled in again. Rubble used as backfill, protected with a watertight layer of materials and topsoil and sowed with local grass. Elimination of an ovoid under the backfill and construction of an aerial crosswalk with plunge pool and cascades

 

Before treatment
Treatment of mining sites
After treatment
Treatment and rehabilitation of mining sites

 

 

Treament of a tailing pond of roughly 3,5 million m3. Slight terrain remodeling to shape the slopes, applying a watertight layer of clay, a layer of topsoil and sowing with local grass.

 

Before treatment
dam treatment

After treatment (about10 Ha)
dam treatment and terrain remodeling

 

 

 

 

Copyright © 2024 MTPS english version - Website creation : CAPLASER