Safety Blasting

 

Preventive explosion taking into account
an EDF tunnel located less than 30 ml away, and additionnally
the work site spills into the Parc National des Pyrénées
Preventive explosion

Blast in tunnel under a hydroelectric power plant. After breaking up the calotte and carrying out the blast, we remove the guards of the clamshell
with a bucket mounted on an excavator
Blast in tunnel under a hydroelectric power plant

 

 

 

CFL drilling in mine shaft
to create a 20-ml deep,
3-m diameter
ventilation well
et de 3 m de diamètre

 

Deepening the
7-m tunnel to install
a new turbine
(drilled-shaft type).
Deepening of a tunnel
CFL drilling in mine shaft to create a ventilation well

 

 

 